液压升降平台http://www.rgsjpt.com/有两边四组导轨支撑而起的,常规情况下导轨的长度要比总的行程高度高于两米。由于导轨柱高度和重量非常的大,所以很多时候安装起来特别的不方便。下面我们介绍一下常规情况下几种安装导轨的方法。
Hydraulic lifting platform has four sets of guide rails on both sides of the support into the sky, the length of the conventional case rail travel than the total height above two meters. Since the guide column height and weight is very
large, so a lot of time to install them particularly inconvenient. Here we introduce the conventional case of several mounting rails approach.
室外安装液压升降平台http://www.rgsjpt.com/,由于位置在室外,可以选择使用吊车进行吊装。吊车把导轨柱竖起再进行焊接,这样就比较方便了。如果室外安装又没有办法进入吊车,就需要搭建承重的支架再吊电动葫芦再进行安装。室内安装的话由于情况比较复杂,如果是常规的楼板安装可以选择使用电动葫芦吊装。而钢结构厂房在安装的时候一定要先看安装的位置上空是否有主梁,如果没有承重的主梁也要考虑搭建。
Outdoor installation of hydraulic lifting platform, the position in the outdoor, you can choose to use the crane hoisting. Rail column erect another crane to be welded, so it is more convenient. If outdoor installation is no way to enter the cable car, we need to build a load-bearing bracket and then lifting hoist before installation. Indoor installation, then the situation is more complicated due, if conventional floor installation can choose to use electric hoist lifting. The steel plant over the position when installed must look at whether there is main beam is installed, if there is no load-bearing structures have to consider the main beam.